Participating in the meeting for the Renovation Committee:
Others who also participated:
The meeting began at 6:15pm CST and ended at
6:30pm CST
Summary of topic discussed:
-
Fiona's father had a heart attack was undergoing
surgery on Wednesday morning. Darnell had not heard how it went.
- December Cash Position
- We have $35,000 in the bank at this time with
an open commitment of $43,000.
- Will receive $21,000 early and hoping then we
won't have to go into the bank line until June or July
- Lockers
- The contract is executed for the locker
- We will charge a 1% plenty per day after
January if the lockers aren't finished
- Half of the deposit has been given for the lockers
- **There was stuff left in all 3 closets.
Darnell has put anything left in the lockers in the attics of the
respected building**
-
City Approval
- The architect finished the exterior drawings
and they have been submitted to the City of Breckenridge.
- Breckenridge should give approval by Tuesday
January 16th. Darnell will attend the meeting to find out if we
received 0 or -3 pt.
-
According to Darnell's calculation we have 77%
natural material on the building. If we have over 25% manmade
material on the exterior of the building we will get -3pts. To negate
these points we will have to plant some trees. We are hoping to get 0 points.
- The exterior of the building will remain 1st
floor stone, 2nd cedar, and 3rd hardy plank. However, the internal
stairways were changed to 100% hardy planks (The hardy planks will be
more durable in the stairways).
-
Travis Construction
- Darnell is meeting with Charlie from Travis
tomorrow to see if he needs anything else to start the bidding process.
- The contract is complete and construction is
planned to start April 23rd
-
Hot Tub
- A metal cover with insulation and mechanical
lifter was found at www.be-lite.com It looks nice and will be durable
and lightweight
- Darnell will ask Shannon, hot tub contractor,
to bid it and see how much it would cost us.
- Planning to get a rectangular one instead of
the shape of the hot tub since it will be cheaper to order a standard size.
-
Water Heaters
- Darnell got a bid from the locker
contractor's plumber. The bid of $1130/water heater was for a
Bradford 80 gallon water heater, which is the brand installed currently.
- Darnell will follow up with Fiona to see if
she got any competitive bids and will get the process started for
replacing the water heaters in the next few weeks
-
Windows and Doors
- Letter was sent out to all the owners and a
response is needed by February 15th
- Darnell has talked to about half the owners
at this point. He will contact owners he hasn't heard from so no one
slips between the cracks.
-
Internet
- Internet is working well in the A building
but we only get 40% of the speed Quest promised. This is a Quest
problem and if they can't boost the speed they will charge us
$20/month instead of $50.
- The signal is not good in the B building. Pam
and Randy Rothe have volunteered to put a terminal in their unit for
the B building.
- We will be canceling the internet service
during construction so we don't have to pay for it when it is unused.
Prepared by
Jessie Lindseth
Renovation Committee Secretary